nuclear installation

核设施

常用释义

词性释义

核设施;核装置
例句
  • 全部
1·Recommendation on improvements of safety protections of nuclear installation.
四核子设施安全防护改善之建议。
2·The operator of the relevant nuclear installation is the major body of accountability for on-site emergency work.
核设施营运单位是核事故场内应急工作责任主体。
3·The liability for compensation has not been assumed by another nuclear installation operator under written agreement.
一其赔偿责任,尚未依书面契约由另一核子设施经营者承担者。
4·The quality assurance for the stage of Site Selection and Evaluation of nuclear installation is very important for assuring quality of its activities.
核设施厂址选择、评价阶段的质量保证对保证其活动的质量很重要。
5·With the increasing of Numbers of nuclear installations entering decommissioning period, it is more and more important to optimize the management of nuclear installation decommissioning project.
随着进入退役期的核设施的增多,核设施退役工程管理的优化也越来越重要。
6·Some typical characteristics of Qinshan II 650MW nuclear steam turbine during installation were presented and special measures and major problems as well as their management results were introduced.
阐述讨论了秦山二期650MW核电汽轮机在安装过程中的若干典型特点、所采取的特殊措施,以及遇到的主要问题和处理结果。
7·The microcomputer based nuclear balance is applied in large urea plant. Its system composition, measurement principle, installation, calibration and problems discovered during testing are introduced.
介绍了大型尿素装置中微机核子秤的系统构成,测量原理、安装、调校及在调试过程中发现的问题。
8·Its thermodynamic characteristic has a heavy impaction on the security and economy of a running turbine and the nuclear power installation.
凝汽器运行的热力性能对汽轮机机组运行和核动力装置的安全性与经济性有很多影响。
9·Duty description: as the technical engineer of the electricity plant, solving all problems and incidents happened during the site pipeline installation of electricity plant in nuclear island.
责任描述:担任电气厂房区域的技术工程师,责任是处理核岛电气厂房管道安装过程中现场所遇到的各类问题。
10·These fears have resulted from the development and installation of nuclear power plants.
核电站的设计和建设是产生这种忧虑的原因。
同义词